Pakistan Railways 2025: Karachi–Lahore Bullet Train Project Officially Revealed

By: Sohaib Tahir

On: Friday, November 21, 2025 10:15 AM

Pakistan Railways
Follow Us

Pakistan Railways 2025: Karachi–Lahore Bullet Train Project Officially Revealed. Pakistan is entering a new era of high-speed travel. The government has officially unveiled plans for a Karachi–Lahore Bullet Train, a landmark project that aims to reduce the current 20-hour journey to just five hours by 2030. This announcement marks one of the biggest upgrades in Pakistan Railways history.

A Major Milestone Under CPEC and ML-1 Upgrade

The bullet train project is part of the ML-1 (Main Line-1) upgrade, a $6.8 billion development under the China-Pakistan Economic Corridor (CPEC). The proposed high-speed rail line will stretch 1,215 km and allow trains to run at speeds of up to 250 km/h.

Key cities along the route include:

  • Karachi
  • Hyderabad
  • Multan
  • Sahiwal
  • Lahore

Railways Minister Hanif Abbasi described the project as a “visionary step”, emphasizing that Chinese cooperation—especially from the China Railway Construction Corporation—will help transform Pakistan’s transportation system with modern tracks, new bridges, and advanced digital signalling.

Expected Economic and Social Benefits

The Karachi–Lahore bullet train is more than a transport upgrade—it is expected to reshape Pakistan’s economy and mobility network.

Major benefits include:

  • Creation of thousands of new jobs
  • Boost in trade between major cities
  • Increase in Pakistan Railways’ freight share from 4% to nearly 20% by 2030
  • Reduced pressure on highways and fuel consumption
  • Faster, cheaper, and more efficient movement of goods

Once launched, the bullet train will significantly improve passenger convenience while strengthening Pakistan’s logistics and supply chain systems.

Other Major High-Speed Rail Projects in 2025

1. Lahore–Rawalpindi High-Speed Train

Earlier this year, Punjab Chief Minister Maryam Nawaz Sharif approved a new high-speed rail link between Lahore and Rawalpindi. This project aims to cut travel time to just 2.5 hours, enhancing connectivity within Punjab.

2. Karachi–Rohri Upgrade with ADB Support

The Asian Development Bank (ADB) has agreed to support a $2 billion upgrade for the 500-km Karachi–Rohri stretch.
This section is vital for transporting copper ore from the Reko Diq mine and was taken over by ADB after delays in Chinese funding. A consortium led by the bank is expected to finalize contracts soon.

Digital Transformation of Pakistan Railways

Pakistan Railways is also investing in a complete digital overhaul to increase safety, speed, and communication efficiency.

Upcoming digital features include:

  • New computerized interlocking systems at major junctions
  • A digital microwave communication system along the Karachi–Lahore route
  • Push-to-Talk digital networks for real-time communication across divisions

These upgrades will help the railway system operate with more accuracy, reduced delays, and improved passenger experience.

Why the Karachi–Lahore Bullet Train Matters

The bullet train project signals a major shift toward modern transportation in Pakistan. By integrating advanced technology and international expertise, the government aims to deliver:

  • Faster intercity travel
  • Stronger economic ties
  • Enhanced trade efficiency
  • Improved passenger safety
  • Greater freight capacity

Conclusion

The Karachi–Lahore bullet train project is set to become one of Pakistan’s most transformative infrastructure developments. With CPEC backing, ADB support, and major digital upgrades, Pakistan Railways is moving toward a faster, safer, and globally competitive rail network. If completed on schedule, the 2030 vision could reshape travel and trade across the entire country.

Sohaib Tahir

Sohaib Tahir is the Documentation Officer at the Prime Minister’s Office, bringing authentic updates on PM and CM schemes. He ensures readers get reliable, verified news on government policies and initiatives.

Leave a Comment

error: Content is protected !!